A lighting design that is not simulated is an estimate with a confidence interval nobody has calculated. Photometric simulation converts a fixture’s measured light distribution into a predicted illuminance map of the actual space, and it is the only practical way to check uniformity, glare and compliance before the fixtures are ordered. This white paper walks through the working sequence used in the three dominant tools, DIALux evo, AGi32 and Relux, and identifies which inputs actually move the result.
1. What the simulation actually computes
All three tools perform the same underlying calculation: they integrate the flux emitted by each luminaire, weighted by its intensity distribution und die distance and orientation relative to every point in the calculation grid, und dien apply the surface reflectance to account for inter-reflection. The output is an illuminance value at each grid point, plus derived metrics such as uniformity and glare index.
Understanding this matters because it identifies the five inputs that govern the answer:
| Input | Where it comes from | Sensitivity of result |
|---|---|---|
| Luminaire intensity distribution | IES/LDT photometric file | Sehr hoch |
| Leuchtenstrom | Photometric file or datasheet | Sehr hoch |
| Room geometry | Architectural drawing | Medium |
| Surface reflectance | Material library | Medium (inter-reflection) |
| Maintenance factor | Design assumption | High (applied as a multiplier) |
A common and expensive error is to tune the fixture count while leaving the maintenance factor at its default of 0.80. For a high-bay installation in a dusty foundry, the correct factor may be 0.60, which increases the required fixture count by a third. The maintenance factor is a design decision, not a software default.
2. The seven-step workflow
The sequence below applies to all three tools with only the menu names differing.
- Create the room. Enter the exact geometry: length, width and height to the underside of the structural slab, not to the ceiling grid. Record the work-plane height, which in industrial spaces is the task surface (typically 0.80 m in offices, but 0 m or 0.20 m in warehouses where the floor is the task).
- Assign surface materials. Set ceiling, wall and floor reflectance. Defaults are acceptable for offices; for a cleanroom with high-reflectance epoxy floors or a dark foundry interior, replace them. The difference between total reflectance and near-zero reflectance can shift indirect illuminance by a factor of two.
- Import the photometric file. Use the IES or LDT file supplied with the fixture, not a generic distribution. If the file is missing, request it: a real file from Z-16 or Z-13 carries measured intensity at hundreds of angles, while a synthetic distribution carries the designer’s guess.
- Place the luminaires. Enter the mounting height, spacing and orientation. Run at least two layouts so the uniformity comparison is meaningful.
- Define the calculation grid. Set grid spacing fine enough to reveal non-uniformity: a spacing no coarser than 0.5 m for task areas, and always an odd number of grid points so that the centre point is included.
- Set the maintenance factor. Derive it from the luminaire maintenance factor und die room surface maintenance factor, or take the value specified by the client’s standard.
- Read the results. Report average illuminance, minimum, uniformity U0 (E_min / E_Durchschn), und die glare metric. A single average figure conceals the failure modes of interest.
| Metric | Symbol | Definition | Typisches Ziel |
|---|---|---|---|
| Durchschnittliche Beleuchtungsstärke | E_Durchschn | Mean over grid | Per standard, e.g. 300 lx office |
| Uniformity | U0 | E_min / E_Durchschn | ≥ 0,40 Aufgabe, ≥ 0,25 Zirkulation |
| Uniformity | U1 | E_min / E_max | Used in sports and inspection |
| Glare | UGR | Unified glare rating | ≤ 19 office, ≤ 25 industrial |
| Specific power | LPD | W/m² | Per energy code |
3. Reading the illuminance grid
The simulation output that matters most is the spatial distribution, not the average. The curve below shows a cross-section through a warehouse aisle at two different mounting heights, holding fixture count constant.
The shape of this curve is the whole argument for co-designing mounting height with beam angle. Raising the fixture from 6 m to 12 m reduces peak illuminance by roughly a factor of four in the inverse-square region, and simultaneously flattens the profile, so that neither the peak nor the uniformity target is met. Adding fixtures at the higher mounting height restores the average but not the uniformity, because the spacing needed for uniformity scales with height.
4. Uniformity versus spacing-to-height ratio
The spacing-to-height ratio (SHR) is the design variable that couples illuminance level to uniformity, and it is the fastest sanity check available before running a full simulation. The curves below show the relationship for three distributions.
Read the curves at the 0.40 threshold. A 60° distribution holds U0 above 0.40 only up to an SHR of about 0.9, while a 120° distribution holds it to about 1.3. This is why Z-16 high-bay luminaires are commonly offered with two optical variants: the narrow version for tall spaces where the ceiling height itself fixes a low SHR, und die wide version for lower spaces where fixture count must be minimised. Selecting the optic without checking the SHR is the most frequent cause of a simulated design that looks acceptable on average and fails the uniformity requirement.
5. Where the three tools differ in practice
The tools compute the same physics; they differ in workflow and in the accompanying libraries.
| Aspect | DIALux evo | AGi32 | Relux |
|---|---|---|---|
| Geometry input | Integrated CAD, DWG import | CAD-like drawing or DWG | DXF/DWG import |
| Photometric file | IES, LDT, ULD | IES, LDT | IES, LDT, EULUMDAT |
| Standards libraries | Extensive, EN-centric | Extensive, North-America-centric | Extensive, EN-centric |
| Glare calculation | UGR, GR | UGR, VCP, GR | UGR, GR |
| Road lighting | Integrated module | Add-on module | Integrated module |
| Typische Verwendungr | European specifiers | Nordamerikan specifiers | European specifiers |
| Result presentation | Eingebaut report generator | Report generator | Report generator |
For projects requiring both EN 12464 and GB 50034 compliance, run the calculation once und dien compare the reported metrics against both standards’ limits rather than re-simulating: the physics does not change with the standard, only the acceptance threshold does.
6. Validation: making sure the simulation is trustworthy
Simulation output should never be delivered without a validation step, because a single mis-entered parameter can produce a confident and completely wrong result.
| Check | Method | Acceptance |
|---|---|---|
| Photometric file integrity | Compare file flux with datasheet lumens | Within 3 % |
| Geometry sanity | Compare room volume with drawing | Exact |
| Grid resolution | Halve spacing, re-run | Average shifts < 2 % |
| Maintenance factor | Compare with client standard | Documented |
| Cross-tool agreement | Re-run one layout in a second tool | Averages within 5 % |
| Post-installation comparison | Measure with calibrated meter | Innerhalb von 10 % der Vorhersage |
The last row deserves emphasis. The purpose of simulation is to predict the installed result, so a measurement after commissioning closes the loop. Where measured illuminance deviates by more than ten percent, the usual causes in order of likelihood are: incorrect mounting height as built, a maintenance factor that does not match the actual cleaning regime, an incorrect photometric file, and dirty or aged luminaires during measurement.
7. Deliverable set for a design submission
A complete photometric submission for a commercial or industrial project normally contains the following documents. Specifying them up front avoids rework at the approval stage.
- Room summary with geometry, reflectance and work-plane height
- Luminaire schedule with photometric file references, flux and power
- Layout drawing showing positions and spacing
- Illuminance grid with values, and a colour or contour map
- Uniformity and glare summary against the governing standard
- Specific power (LPD) calculation
- Maintenance factor derivation
8. Conclusion
Photometric simulation is a deterministic calculation that becomes unreliable only through its inputs. For Z-16 Hochregal, Z-13 Reinraum und Z-15 tri-proof installations, the practical sequence is: obtain the real IES file, derive the maintenance factor from the actual environment, choose the optic by checking the spacing-to-height ratio against the uniformity target, and validate the result by measurement after commissioning. Following that sequence converts a simulation from a compliance formality into a procurement decision.
8. Production commissioning: from prediction to measurement
The measurement step is where a simulation programme either earns its credibility or loses it, so it deserves its own procedure rather than being treated as an afterthought. Three conditions must be controlled before any reading is taken.
Burn-in before measurement. New LED luminaires settle for the first 100 hours as the phosphor and encapsulant reach thermal equilibrium und die drive electronics stabilise. Measuring before this point reads high and produces an optimistic comparison. The standard practice is to operate the installation for at least 100 hours, or to apply a documented burn-in correction, before commissioning measurements.
Meter calibration and cosine response. A calibrated illuminance meter with a photopic-corrected detector is the minimum requirement. Probes without a cosine corrector over-read at oblique incidence, which biases any reading taken off-axis. Verify the calibration certificate date and confirm the meter is within its validity window before the survey.
Measurement grid identical to the simulation grid. If the simulation used a 0.5 m grid with an odd number of points, the survey must use the same grid. Comparing a fine simulated grid against a coarse measured grid creates apparent deviations that are artefacts of the comparison rather than real discrepancies.
| Deviation found | Most likely cause | Corrective action |
|---|---|---|
| Measured 10–20 % low | Maintenance factor too optimistic | Re-derive from actual dirt conditions |
| Measured peak much lower than predicted | Mounting height as built differs | Survey the actual height and re-simulate |
| Uniformity worse than predicted | Spacing not as drawn | Verify luminaire positions |
| Isolated dark zones | Failed or unpowered luminaire | Electrical check |
| Measured 5–10 % high | Measurement before burn-in | Repeat after 100 hours |
| Colour shift visible though illuminance matches | Wrong bin or CCT delivered | Verify delivered binning |
The table above is diagnostic rather than exhaustive, but it captures the order of likelihood. In field investigations of commissioning shortfalls, mounting height and maintenance factor account for the majority of genuine deviations, while meter errors and pre-burn-in measurements account for most of the apparent ones.
10. Referenzierte Standards
- IES LM-79 – Zugelassene Methode: elektrische und photometrische Messungen von Festkörperbeleuchtungsprodukten
- CIE 154 – Die Wartung von Außenbeleuchtungssystemen
- CIE 97 – Wartung elektrischer Innenbeleuchtungssysteme
- EN 12464-1 – Licht und Beleuchtung: Beleuchtung von Arbeitsplätzen, Innenbereich
- EN 12464-2 – Licht und Beleuchtung: Beleuchtung von Arbeitsplätzen, im Freien
- GB 50034 – Standard für die Beleuchtungsplanung von Gebäuden
- IES LM-63 — Standard file format for electronic transfer of photometric data
11. Kontaktieren Sie uns
QUEENDOM supplies IES photometric files for the lighting range and can provide reference layouts for Hochregal, Reinraum und tri-proof applications. Kontakt the lighting engineering group with the room dimensions, mounting height and target illuminance, und die appropriate photometric file and optic variant will be supplied for simulation.
Verwandte Produkte und Anwendungen
The luminaires used in the simulation workflow are available in the following families.